CNG gas station
The CNG standard station is built in places where natural gas pipelines pass through,and gas is directly taken from the natural gas pipelines.Natural gas enters the compressor unit through processes such as desulfurization,pressure regulation,metering,filtration,and dehydration.It is then compressed,cooled,and purified to increase its pressure to 25Mpa.Finally,gas is added to the high-pressure trailer through a gas column,and gas is also added to the car through a gas dispenser.Our company can provide overall solutions and turnkey projects.
Equipment composition:intake filtration pressure regulating and metering device,desulfurization tower,low-pressure dehydration device,piston compressor,sequence control panel,gas storage cylinder group,gas dispenser,gas column,CNG trailer,gas alarm device,and other equipment.
Floor area:approximately 2000-4000m2
Optimal transportation radius:150km
Suitable scale:≥40000 Nm3/d
Equipment installation time:approximately 30 days.